Boral Masonary
Boral Masonry approached Concrete Techniques with concerns relating to the safety of employees while operating machinery and walking throughout their plant. The consensus was that a long-term safety solution would be put in place. The top of the substrate was removed by us and replaced with a long-term coating system that would eliminate other associated problems. Allocated walkways were instituted throughout the plant for the safety of people sharing the same space as forklifts while providing a non-slip system to eliminate workplace injuries.
![](https://assets.website-files.com/60fa1b45ea5ac6854da8549d/610df4db7de9011a9cb4225c_BowralMasonary-1.jpg)
![](https://assets.website-files.com/60fa1b45ea5ac6854da8549d/610df4dbdfa2651763d7003e_BowralMasonary-2.jpg)
![](https://assets.website-files.com/60fa1b45ea5ac6854da8549d/610df4db8461e5775b4012fc_BowralMasonary-3.jpg)
![](https://assets.website-files.com/60fa1b45ea5ac6854da8549d/610df4dbec6be767394316f4_BowralMasonary-4.jpg)
![](https://assets.website-files.com/60fa1b45ea5ac6854da8549d/610df4dbe987d84659c66e5e_BowralMasonary-5.jpg)
![](https://assets.website-files.com/60fa1b45ea5ac6854da8549d/610df4db72cc61e5fc5ab4cf_BowralMasonary-6.jpg)
![](https://assets.website-files.com/60fa1b45ea5ac6854da8549d/610df4db0625e1c75cb75d46_BowralMasonary-7.jpg)