Concrete Techniques
Australia . Asia . New Zealand

Eastern Treatment Plant

Geotechnical Engineering employed us to supply a system suitable for the Eastern Treatment Plants new SAP building. The systems needed to adhere to several codes within the building of treatment plants, including treatment of sewage and waste, slip resistant and seamless requirements. We supplied an epoxy system that included skimming walls and floors to eliminate cavities and defects achieving the appropriate epoxy seamless flooring system to comply with their standards.

No items found.
BACK TO ALL PROJECTS